CNB
Kanpur Central
NCR · Prayagraj Division · 9 PF
Simulation mode14:00

Station configuration — CNB

Values below are simulated. Enter verified data from the official station diagram and Station Working Rules. Changes take effect on the allocation plan immediately.

PF 1
Permitted categories
Route connectivity (arr / dep)
PF 2
Permitted categories
Route connectivity (arr / dep)
PF 3
Permitted categories
Route connectivity (arr / dep)
PF 4
Permitted categories
Route connectivity (arr / dep)
PF 5
Permitted categories
Route connectivity (arr / dep)
PF 6
Permitted categories
Route connectivity (arr / dep)
PF 7
Permitted categories
Route connectivity (arr / dep)
PF 8
Permitted categories
Route connectivity (arr / dep)
PF 9
Permitted categories
Route connectivity (arr / dep)

Data integration layer

Simulation feed60 s synthetic position updatesActive
CRIS train tracking APIRequires authorised accessNot connected
NTES running informationRequires authorised accessNot connected
Timetable (SWR / WTT)Replace with verified working timetableDemo data
Platform occupancy (track circuits)Optional interlocking feedNot connected